Asphalt Plant Locations

AT A GLANCE

  • Project Name: NAS/JRB (Naval Air Station/Joint Reserve Base)
  • Location: Fort Worth, Texas
  • Duration: 25 days
  • Project Type: Airports
  • Status: Complete

NAS/JRB (Naval Air Station/Joint Reserve Base)

This Corp of Engineers project consisted of 25,000 tons of runway repaving. Sunmount Paving teams used 3D automation for the milling and asphalt paving. The project was high profile and fast-trackedto be completed in just 25 days. Sunmount Paving teams completed the projectunder budget and on time. Included with the NAS/JRB location were multiple task orders comprising of concrete paving, drainage, soil stabilization, excavation/embankment and hot mix paving. The final contract value for the project totaled $3.2 Million.