This Corp of Engineers project consisted of 25,000 tons of runway repaving. Sunmount Paving teams used 3D automation for the milling and asphalt paving.
This project extends two existing runways and associated taxiways at the world's first 100% industrial airport designed for cargo and corporate aviation: The Ft. Worth Alliance Airport (AFW).
The scope of this project included reconstructing and repaving the entire 1.5-mile racing surface of the world-renowned Texas Motor Speedway, along with the pit road giving race teams access to the track.
This facilities-expansion project for the BNSF Railway corporation involve improvements to the existing railyard facilities in Ft.
Sunmount Paving teams began work on this TxDOT public maintenance project in October 2019.
This public roadway project involves milling and repaving 8.2 miles of FM51 in Parker County, TX. Additionally, teams will construct new turn lanes and perform pavement marking for a portion of the road located north of Weatherford, Texas on US51.
This $2,511,823 resurfacing project for the TxDOT involves milling and paving a 2.25-mile stretch of US-281 in Jack County, Texas. Sunmount Paving teams are responsible for milling 95,000 SY of material to depths of 2 to 3 inches, as well as performing flexible pavement repairs which were increase by the TxDOT from 2,000 SY to 30,000 SY of material.